TECO Energy
Riverview, FL
Tampa Electric Company
41.7
349,440 x First Solar
15 x SMA
NEXTracker single-axis
Bonnie Mine Solar is built on a 352-acre former phosphate mine east of Bonnie Mine Road and south of State Road 60 between Mulberry and Bartow. A 41.7 MWdc project, Bonnie Mine is expected to generate enough clean energy to power 4,250 homes served by the Tampa Electric Company.
Bonnie Mine Solar is built on a 352-acre former phosphate mine east of Bonnie Mine Road and south of State Road 60 between Mulberry and Bartow. A 41.7 MWdc project, Bonnie Mine is expected to generate enough clean energy to power 4,250 homes served by the Tampa Electric Company.